Tuli Dam - Installation (Within WTP)Tuli Dam Water Treatment Complex, within the Dam wall site required a 180 kl Tank on 15 meter Stand for operational reasons. Who was the...
Serowe Primary HospitalInstalled in effectively 3 days + Pipework and ready to receive water -- The installation was completely sub-assembled in Ramotswa -...
Another one -- By SavannaAnother completed project in Gab's newest CBD !!!! A total of 7 tanks, all installed and tested -- 3 Fire tanks - 4 domestic water (2/2...
Pipe Fittings / Less Stress / Local Stock Levels -- In GabsAnother First for Botswana Let’s go full blast!!! Being in the water industry , we know full well of some of the critical problems in...
Galvanized Pipe Fittings Manufactured In Botswana – Sav PipeWith our CnC machines manufacturing pipe connections is like taking candy from a baby!!! Easy as 1,2,3 – You plug in the diameter ,...